Trigon provided engineering services to the construction contractor during the pre-construction and construction phases of this project, which consisted of the construction of a new six-pump storm water drainage pump station with a total capacity of 1,300 cubic feet per second.
The project generally included a large pile-supported foundation, multi-story building structure, pumps and engines, integrated intake structure, suction and discharge basins, discharge piping, bar screens and cleaners, diesel oil storage tanks, utilities, electrical and controls systems, power generation and distribution, pilings, site work, levee T-wall, approach roadway and drive, and other ancillary work.
The site is located on the Lake Pontchartrain Hurricane Protection Levee at Cross Bayou Canal near Ormond in St. Charles Parish.
The project was performed for the Pontchartrain Levee District and is part of the Louisiana Department of Transportation and Development’s Statewide Flood Control Program. The U.S. Army Corps of Engineers was also a key stakeholder in this project.
Water • Engineering & Design • Project / Program Management
View E. 70th Street (LA 511) – Cresswell Road to East Ridge Drive Water Main RelocationProject
Engineering & Design • Project / Program Management • International Development
View Dura Recreational Park Conceptual DesignProject
Water • Construction Management • Emergency Management
View Oak Street Raw Water Pump StationProject
Transportation • Environment & Remediation • Planning • Engineering & Design
View Stage 1 Environmental Assessment for US 61/Airline Highway at LA 3152/Clearview Parkway ImprovementsProject