This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Water • Engineering & Design • Emergency Management
View Watermain Replacement in Mandell Place, Montrose, Westmoreland, and Courtland Place SubdivisionsProject
Water • Engineering & Design • Project / Program Management
View Highway 11 Water Line ImprovementsProject
Construction Management • Emergency Management • Engineering & Design
View Facilities Condition Assessment and Construction Management Services for Orleans Parish School Board PropertiesProject
Transportation • Engineering & Design • Construction Management • International Development
View Infrastructure Needs Program Phase II (INP II), Multiple Roadway ProjectsProject