This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Construction Management • Emergency Management • Engineering & Design
View Facilities Condition Assessment and Construction Management Services for Orleans Parish School Board PropertiesProject
Environment & Remediation • Engineering & Design • Project / Program Management • Planning • Construction Management • International Development
View Remediation Design for Dioxin Remediation at Bien Hoa AirbaseProject
Engineering & Design • Project / Program Management • International Development
View Dura Recreational Park Conceptual DesignProject
Project / Program Management • Planning • International Development
View Field Support Services Program for Global Affairs CanadaProject