Img 5628 Crop

Robindale Subdivision Drainage Feasibility & Modeling

  • ClientSt. Tammany Parish Government
  • LocationCovington, LA
  • Cost$180k (fee)

Key Services:

  • Site Inspection & Assessments
  • Improvement Plans & Recommendations
  • Engineering & Design
  • Cost Estimating
  • Project Management
  • Preparation of Technical Reports

Trigon is leading drainage evaluation and improvement planning for the Robindale Subdivision, a residential community west of Abita Springs experiencing recurring flooding. Phase I focuses on feasibility analysis and advanced hydrologic and hydraulic modeling to define a practical, cost-effective path toward long-term drainage improvements.

Our team is leveraging GIS data, detailed field surveys, and a calibrated PCSWMM model to assess existing system performance and test improvement alternatives that meet current St. Tammany Parish design standards. Deliverables include a comprehensive feasibility study, phased improvement strategy, and Opinion of Probable Construction Cost—providing the Parish with a clear, data-driven roadmap for implementation.

Building on watershed-level insights from Trigon’s adjacent Abita Nursery Drainage Improvements project, this effort supports integrated stormwater solutions that reduce flood risk, strengthen neighborhood resilience, and position the Parish to pursue state and federal hazard mitigation funding.