This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Drainage • Engineering & Design • Emergency Management • Project / Program Management • Featured
View Abita Nursery Drainage Study & Improvements DesignProject
Transportation • Environment & Remediation • Planning • Engineering & Design
View Stage 1 Environmental Assessment for US 61/Airline Highway at LA 3152/Clearview Parkway ImprovementsProject
Wastewater • Engineering & Design • Project / Program Management • Construction Management
View Happy Jack Area Sewer ImprovementsProject
Transportation • Engineering & Design • Drainage • Water • Wastewater
View Delta Aire Drive Roadway & Infrastructure ImprovementsProject