This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Wastewater • Engineering & Design • Project / Program Management • Construction Management • Emergency Management
View Buras Wastewater Treatment Plant Assessment & ImprovementsProject
Water • Engineering & Design • Project / Program Management
View E. 70th Street (LA 511) – Cresswell Road to East Ridge Drive Water Main RelocationProject
Wastewater • Planning • Engineering & Design • International Development
View Packaged Wastewater Treatment Plants Feasibility StudyProject
Water • Engineering & Design
View District B Miscellaneous Water ImprovementsProject