This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Transportation • Engineering & Design • Water • Wastewater • Drainage • Featured
View F. Edward Hebert Boulevard Roadway ImprovementsProject
Transportation • Environment & Remediation • Planning • Engineering & Design
View Stage 1 Environmental Assessment for US 61/Airline Highway at LA 3152/Clearview Parkway ImprovementsProject
Wastewater • Engineering & Design • Construction Management • International Development
View Al Yamoun & Qabatia Wastewater Treatment Plants and Collection SystemsProject
Transportation • Engineering & Design • Construction Management • Emergency Management
View Recovery Roads Program, Multiple ProjectsProject