Slidell Sewer Map
Slidell Sewer
  • ClientCity of Slidell
  • LocationSlidell, LA
  • Cost$135k

Key Services:

  • Site Inspection & Assessments
  • Improvement Plans & Recommendations
  • Preparation of Construction Contract Documents
  • Cost Estimating
  • Bid/Award Phase Services
  • Construction Phase Services

Trigon performed engineering and design services to facilitate the repair of the City’s collection system at various locations identified previously through CCTV inspections. Damage to the City’s sanitary sewer system was a direct result of Hurricane Katrina. The system was partially clogged by silt and debris and required immediate attention and cleaning to prevent or minimize overflow of raw sewage. The sanitary sewer system also sustained damages that require point / service repairs, obstruction removals and cured-in-place pipe (CIPP) lining which were designed as part of this project.

Trigon provided the following general services:
• Design of improvements, including site visits to verify field conditions and preparation of contract documents (specifications and drawings).
• Bid phase services to support the City in successfully bidding and awarding the construction contract
• Construction phase services, particularly with respect to conducting the pre-construction conference, technical review of submittals, responding to requests for information/clarifications, and support to the City in contract closeout procedures (including final change order).

The project was completed and closed out in 2011.

Trigon Logo

Global Reach. Local Impact.

Partner With Us Today

Contact Us

Trigon Associates
1515 Poydras Street, Suite 930
New Orleans, Louisiana 70112
P: (504) 585-5767
F: (504) 585-5747
trigon@trigonassociates.com

Explore

About Us
Services
Clients
Portfolio
Careers
News

Expertise

Trigon Logo
Privacy Policy | Terms of Use
©2024 Trigon Associates
Website & Development by Voodoo Creative