Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
Wastewater • Engineering & Design • Project / Program Management • Emergency Management
View Hurricane Katrina-Related Sewer System RepairsProject
Wastewater • Planning • Engineering & Design
View Effluent Force Main Evaluation/Study for WWTP No. 3Project
Water • Engineering & Design • Planning • Featured
View Water Quality Master PlanProject
Transportation • Construction Management • Engineering & Design
View Off-System Bridge Load Rating ServicesProject