Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
Drainage • Engineering & Design • Project / Program Management • Construction Management • Emergency Management
View Engineers Road/Cazalard Road Drainage ImprovementsProject
Construction Management • Project / Program Management • International Development • Featured
View Construction Management for Jordan School Expansion Project (JSEP) and Schools for a Knowledge Economy Project (SKEP)Project
Wastewater • Planning • Engineering & Design • International Development
View Packaged Wastewater Treatment Plants Feasibility StudyProject
Wastewater • Engineering & Design • Project / Program Management • Construction Management • Featured
View Sewer System Evaluation and Rehabilitation ProgramProject