Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
International Development • Project / Program Management • Environment & Remediation • Engineering & Design • Featured
View A-E Services for Dioxin Remediation at Bien Hoa Airbase AreaProject
Wastewater • Engineering & Design • Emergency Management
View South Shore Basin and Ninth Ward Basin Sewer Rehabilitation DesignProject
Drainage • Engineering & Design • Project / Program Management • Emergency Management • Construction Management
View Barriere Road/Medal of Honor Park Drainage ImprovementsProject
Drainage • Engineering & Design • Construction Management
View Cross Bayou Drainage Pump StationProject