Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
Wastewater • Engineering & Design • Project / Program Management • Emergency Management
View Hurricane Katrina-Related Sewer System RepairsProject
Drainage • Emergency Management • Construction Management • Engineering & Design
View Permanent Protection for Drainage Outfall Canals and Pump StationsProject
Drainage • Engineering & Design • Construction Management
View Cross Bayou Drainage Pump StationProject
Wastewater • Engineering & Design • Project / Program Management • Construction Management • Emergency Management • Featured
View E. 9th Avenue Lift Station (LS #4) ImprovementsProject