Trigon performed all engineering and design for this $7.9M project that included two (2) 522,000-gallon diesel storage tanks; containment area; and delivery system comprised of one (1) 15,000-gallon day tank, piping, and valves. Also included the following ancillary equipment: two (2) fuel polishing units, one (1) oil-water separator, and a fire suppression system with AFFF bladder tank, potable water booster pump, and fire detection system. Trigon also performed environmental review and permitting services, as well as provided resident construction inspection and engineering services during construction. Project was completed in October 2019.
Emergency Management • Project / Program Management • Planning • Engineering & Design • Construction Management
View Hazard Mitigation Wind Retrofit of 30 Parish-Owned FacilitiesProject
Wastewater • Engineering & Design • Project / Program Management • Construction Management • Featured
View East Bank Wastewater Treatment Plant RAS Line and Pump Station ModificationsProject
Transportation • Engineering & Design • Water • Wastewater • Drainage
View Louis Morel Lane Roadway & Infrastructure ImprovementsProject
Wastewater • Project / Program Management • Emergency Management • Engineering & Design • Featured
View Hurricane Harvey Disaster Recovery for Wastewater Facilities and Collection SystemProject