Effluent Pump Station at the East Bank Wastewater Treatment Plant

  • ClientSewerage & Water Board of New Orleans
  • LocationNew Orleans, LA
  • Cost$108k

Key Services:

  • Site Inspection & Assessments
  • Improvement Plans & Recommendations
  • Preparation of Construction Contract Documents
  • Cost Estimating
  • Bid/Award Phase Services
  • Construction Phase Services

Trigon was a major subconsultant for the engineering, design and construction phase services for this project that involved improvements to the Effluent Pump Station at the Sewerage & Water Board’s 200 MGD East Bank Wastewater Treatment Plant (EBWWTP).

The purpose of the project was to evaluate and design improvements primarily to the electrical system at the effluent pump station and involved the preparation of detailed plans for modifying or replacing existing switchgear, a T5 transformer, resistor bank speed controllers, and variable frequency drives (VFDs), as well as the construction of a new, air-conditioned equipment room on the pump motor room floor. The new switch gear and VFDs were relocated to this newly constructed room, and existing motors would be rehabilitated or replaced to accommodate the new VFDs. In addition, all new equipment was connected to the plant’s SCADA system to provide control of the effluent pumps using the VFDs.

The project also included hydraulic evaluation of the capacity of the effluent pump station and the demolition of old equipment.

Trigon Logo

Global Reach. Local Impact.

Partner With Us Today

Contact Us

Trigon Associates
1515 Poydras Street, Suite 930
New Orleans, Louisiana 70112
P: (504) 585-5767
F: (504) 585-5747
trigon@trigonassociates.com

Explore

About Us
Services
Clients
Portfolio
Careers
News

Expertise

Trigon Logo
Privacy Policy | Terms of Use
©2024 Trigon Associates
Website & Development by Voodoo Creative