This project included the preparation of a Stage 1 Environmental Assessment (EA) and other related documents for the replacement of the existing Belle Chasse tunnel and bridge with a new four-lane bridge facility. The alternatives include one fixed high-level bridge and two movable bridges, each with a different clearance from the bottom of the bridge to the mean high tide level in the Gulf Intracoastal Waterway (GIWW). In addition, the EA considered the No Build Alternative. The Stage 1 Environmental Assessment was conducted in accordance with National Environmental Policy Act (NEPA) and Federal Highway Administration (FHWA) regulations and guidelines.
Trigon’s primary responsibilities included environmental site assessment oversight/QA, traffic counts/study, development of typical sections, right-of-way and utilities assessment, and construction maintenance of traffic plans.
Wastewater • Engineering & Design • Project / Program Management
View East Bank Wastewater Treatment Plant Bleach Disinfection SystemProject
Transportation • Engineering & Design • Drainage • Water • Wastewater
View Delta Aire Drive Roadway & Infrastructure ImprovementsProject
Wastewater • Engineering & Design • Construction Management • International Development
View Al Yamoun & Qabatia Wastewater Treatment Plants and Collection SystemsProject
Water • Engineering & Design • Construction Management • Emergency Management • Featured